caesars entertainment casinos in las vegas directions to meadows racetrack and casino are there any casinos in maui holland casino amsterdam west-sloterdijk amsterdam niederlande whats ac bill in las vegas casino when do casinos ask for social security number aruba marriott resort & stellaris casino noord restaurants in bellagio casino las vegas what is a stick and poke tattoo las vegas poker and blackjack intellivision how much does a casino make a day are there casinos in toronto canada where is san manuel casino in california how much is jack worth in blackjack phone number for desert diamond casino agen taruhan casino 368bet deposit 50 ribu gun lake casino age limit to gamble juego de casino para pc full español
  • + 44 74059 49949
  • Sat- Mon : 08am - 17.00 pm

Finish Process

Qualified and reliable Company for remodeling project.

Our Qualified plumber will come to fix all sanitary wares. Fixing a bathroom faucet, toilet, sink, radiator will be done in just one day.

Why Choose Our Service?

To compliment your new bathroom, we will make perfect fit to suit your requirements, and compliment your design. If will need customized, we will do it.

Expert People

Professionals who has acquired skills through study and practice over the years

Success Company

Our Team is multi trade skilled and fully insured

Quality Work

Is the value of work delivered by our team

24/7 Support

In case of emergency we are available all the time during the project

2nd Fix Electrics

This particular stage entails installing those items that are to be included in the brand new bathroom installation:

The underfloor heating thermostat

The ceiling spotlights & linked pull cord

The electric shaver plug

The extractor fan and isolating switch

During this bathroom installation the door was rehung on the opposite side or cut the bottom to provide the clients extra space upon coming into the bathroom.

  •  
bathroom-double-modern
modern-bathroom-nice-finish

2nd Fix Plumbing

This particular step included the fitting / plumbing for the following items:

  • The thermostatic shower onto the hot & cold feeds protruding from the wall
  • The bath screen
  • The toilet cistern and returning to wall pan & soft close seat
  • The basin and basin mixer tap

The vanity element was assembled and suited to the wall ready for use.

The following items were next fitted to complete:

  • Venetian blind
  • Toilet roll holder
  • Cabinet
X